Current Project:
Project 1: This will install rip-rap aprons, a stilling basin, at-grade crossing, stone toe to support the stream bank.
Project 2: This will include a cross vane, a one-sided two-stage ditch, and a stone toe to support the stream bank.
Project 3: This will include repairs to the pond outlet structure, downstream channel restoration & incoming gul
Holding Pond Maintenance:
Repair and dredging of the existing holding pond on the Crow property which has filled with sediment over the past 30 years.
Spear Rd. Drainage Culvert:
Exert of letter from Adam B. November 2024
Regarding the beavers, I am working on getting the beaver outflow contract setup for bid. There aren't any traps out currently. The cage that can be seen is the guard. Trapping is likely if they move back into that pond when the water level comes up again.
When I came into this role that it didn't sound like the county had plans t
University Bio Station Boathouse:
Exert of letter from Adam B. November 2024
I have a contractor that will be doing boathouse demolition. That will be happening this winter once the ground conditions are better for their equipment. I will likely be closing the trail access near there for safety reasons associated with their equipment use. also, I have planned shoreline restoration. This will remove
Planned Projects:
Ditch that drains runoff from the24 Acre Nature preserve North of Pressler Rd. between 1326 & 1344 E. Pressler Rd.
Farm Ditch Project:
Old Road bed erosion restoration. This project is located in the North East corner of the Farm Ditch Project Map